JOURNAL EDITION PAPER

Volume 9 - Issue 2

INASEA

Upaya Menurunkan Defect Per Unit dengan Menerapkan Quality Information System Menggunakan Metode Gugus Kendali Mutu di Assy Plant Departemen Painting-2

Dondon Try Laksono

Industrial company, especially automotive companies posses unique characteristics compared with other companies. One of these unique characteristics are that they must own a production system which is able to meet customer requests, who recently becomes more and more interested in paint quality. Companies compete to find defect as early as possibl

INASEA

Usulan Penerapan Manufacturing Resource Planning (MRP II) di PT KSP

Anggara Hayun, Johanda

PT KSP is a fibrous food product manufacturing companies "Nata De Coco. Most common problems that arise are shortages or overstocking of products. The purpose of this study is to propose the implementation of Manufacturing Resource Planning system (MRP II). Data is obtained by using forecasting, aggregate planning, capacity requirements

INASEA

Perdana Peningkatan Produksi dengan Metode Keseimbangan Lini pada PD Tegas

Landjono Josowidagdo, Novira Primatari, Sarah Sahputri Perdana

There are several problems faced by the manufacturing industry, such as in PD Tegas in the effort to raise production. One of the problems identified is inappropriate implementation of line balancing. This study is conducted by using 3 methods of line balancing, Ranked Positional Weight (RPW), the Largest Candidate Rule, dan

INASEA

Metode Pengendalian Persediaan Bahan Baku Crude Coconut Oil yang Optimal pada PT PSE

Siti Nur Fadlilah Almunawaroh, S.T., M.T., Andreas, Zahedi

The inventory system is one of the most important managerial functions, since vast majority of companies has large investment involved in this aspect. This also applies to PT. Palko Sari Eka that is big in the field of inventory planning and production control. PT. Palko Sari Eka, as one company

INASEA

Penjadwalan Produksi dengan Pendekatan Metode Nawaz, Enscore, Ham (NEH) dan Metode Campbell, Dudek, Smith

Lorens Handy Sutanto

Company's current scheduling condition is not optimal since too much additional time/work days exists. Planning and creating a better production scheduling system is needed to minimize production time and reduce the additional time. The CDS scheduling method will find the best makespan by combining existing workstations into two groups of machines

INASEA

Implementasi Sistem Dinamik pada Pengembangan Pola Kemitraan Industri Kecil dan Menengah di DKI Jakarta

Fajar Kurniawan

Limited resources in developing small and middle industries in DKI Jakarta have made the growth of these industries to be slow. Small and middle industries must be subsidized by the government and investment companies. The industry itself is a complex system which consists of elements that are related each other so

INASEA

Implementasi Prinsip Kerja 5S pada Bagian Pabrikasi I untuk Meningkatkan Efisiensi Waktu Produksi

Ir. Gunawarman Hartono, M.Eng., Fanni Abdilah Sutantyo

The bridge construction industry has a unique characteristics compared to other industrial companies, namely its production system should be able to meet increasing demands and very high fluctuations. Limited space in the production line and increasing operational costs have made the management of PT BMI obtaining a more appropriate management

Copyright © BINUS UNIVERSITY. All rights reserved.