One of the problems faced in the production process is the unbalanced accumulation of material between workstations and the amount of idle time of employees in finishing the job thereby causing delay in the process of working on a single workstation. This will cause the next
workstation to be delayed therefore
INASEA
Iwan Budihardjo, Muchdopir
A recurring problem in the industry is to determine the order of machines to be used in production in order to get optimal results. The method used to solve this problem is by using a model of Budgeting Capital from Dynamic Programming. With this model each phase of the process
INASEA
M. Afandy
Along with increased consumer demand of motorcycles, PT Astra Honda Motor as the sole manufacturing company as well as the license holder of Honda motorcycle brand, attempt to fulfill consumer demand by increasing production capacity. To be able to increase the amount of planned production capacity, PT Astra Honda Motor,
INASEA
Ketut Gita Ayu, M.S.I.E.
The main objective of the study is to implement a variety of tools necessary for the design of an effectiveness warehouse for company X. The first two phases warehouse activity profiling and warehouse design) are finished. The proposed warehouse design for company X has two floors,
which are ground floor and
INASEA
Budi Aribowo, Natasari
An important problem in manufacturing industry is the lack of capacity calculation in the planning of production. In addition, there are a lot of Work in Process (WIP) the production floor, subsequently increasing length of waiting time in manufacturing. The authors proposed the
implementation of an integrated system of planning priorities
INASEA
Ir. Gunawarman Hartono, M.Eng., Kiki Lianawaty
This study aims to find the optimal value of material planning for the company PT Abbott Indonesia. The purpose of this planning is to be able to obtain information efficiently and in terms of computation time and accuracy. Simplex method is a process that aims to find the optimal value
INASEA
Fendi
Irregular layout of machinery in the local garment division at PT Mulia Knitting Factory Ltd. Has resulted in delay of transfer of materials therefore indirectly affecting production capacity This study aims the design new layout based on product material flow-shirts using routing sheets,
priority scales, from to chart the cost, from