KESEIMBANGAN LINI PRODUKSI PADA PT PAI

Citra Palada

One of the problems faced in the production process is the unbalanced accumulation of material between workstations and the amount of idle time of employees in finishing the job thereby causing delay in the process of working on a single workstation. This will cause the next workstation to be delayed therefore

INASEA

Penggunaan Metode Dynamic Programming untuk Analisis Urutan Penggunaan Mesin Proses Produksi Depakote

Iwan Budihardjo, Muchdopir

A recurring problem in the industry is to determine the order of machines to be used in production in order to get optimal results. The method used to solve this problem is by using a model of Budgeting Capital from Dynamic Programming. With this model each phase of the process

INASEA

New Line 1 Welding Frame Body Comp dalam Peningkatan Kinerja dan Optimalisasi Line

M. Afandy

Along with increased consumer demand of motorcycles, PT Astra Honda Motor as the sole manufacturing company as well as the license holder of Honda motorcycle brand, attempt to fulfill consumer demand by increasing production capacity. To be able to increase the amount of planned production capacity, PT Astra Honda Motor,

INASEA

Proposed Warehouse Layout and Processes Evaluation

Ketut Gita Ayu, M.S.I.E.

The main objective of the study is to implement a variety of tools necessary for the design of an effectiveness warehouse for company X. The first two phases warehouse activity profiling and warehouse design) are finished. The proposed warehouse design for company X has two floors, which are ground floor and

INASEA

Integrasi Perencanaan Prioritas dan Kapasitas Sistem MRP II dengan Sistem Kanban Menggunakan Promodel (The Planning Integration of Priority and Capacity of MRP II System with Kanban System by a Promodel)

Budi Aribowo, Natasari

An important problem in manufacturing industry is the lack of capacity calculation in the planning of production. In addition, there are a lot of Work in Process (WIP) the production floor, subsequently increasing length of waiting time in manufacturing. The authors proposed the implementation of an integrated system of planning priorities

INASEA

Rancangan Model Optimasi Laba Produk Selsun Shampoo Menggunakan Metode Simpleks di PT Abbort Indonesia

Ir. Gunawarman Hartono, M.Eng., Kiki Lianawaty

This study aims to find the optimal value of material planning for the company PT Abbott Indonesia. The purpose of this planning is to be able to obtain information efficiently and in terms of computation time and accuracy. Simplex method is a process that aims to find the optimal value

INASEA

Usulan Perbaikan Layout Produksi Oblong pada Divisi Garmen Lokal di PT MKF, Ltd. (The Improvement Suggestion of Oblong Production Layout on Garment Division at PT MKF, Ltd.)

Fendi

Irregular layout of machinery in the local garment division at PT Mulia Knitting Factory Ltd. Has resulted in delay of transfer of materials therefore indirectly affecting production capacity This study aims the design new layout based on product material flow-shirts using routing sheets, priority scales, from to chart the cost, from