JOURNAL EDITION PAPER
Volume 13 - Issue 2
INASEA
Nunung Nurhasanah, Jann Pratama Simanjutak
PD Sandang Jaya is a garment industry that produces products by order. PD Sandang Jaya realizes how important production processes to meet product demands and increase productivity. Thus, this research goal is to increase productivity by maximizing the existing production on production floor, so that the continuity of material flow
INASEA
Rachmad Hidayat, Anis Arendra
The purpose of this study is to improve engine performance by improving the fermentation of bread heat distribution patterns in the machine and increase energy use efficiency by reducing energy consumption of electricity grid using alternatives other energy sources. In this study, the calculation method used three expert assessments of
INASEA
Ronald Sukwadi
Product quality is one issue in business survival. One of quality strategies using group oriented is known as Quality Control Circle (QCC). The aim of this research is to analyze the effect of the implementation of QCC to the employees work performance and satisfaction at PT PDP. The objects observed
INASEA
Santoso, Chandra Halim
CV Prima Bangun Nusantara is a leather manufacturing company which is currently experiencing an increase in demand from consumers and is planning to build a new factory. Since types of product manufactured are varied and tend to fluctuate every 6 months, the layout should be designed flexible to anticipate the
INASEA
Tiena G Amran, Rury Setyowati
Examining the relationship between factors that effects job performance and job satisfaction is the purpose of this study. Based on the extant literature and research done before on job performance and job satisfaction, we proposed a structural model depicting hypothesized associations between incentive, superiors and working condition on job perfo
INASEA
Wizi Dewi Taniasi, Hartono Wijaya, Susanto Rackman, Fergyanto E. Gunawan
The high road traffic in Jakarta often leads to a massive traffic jam. The problem arises because the volume of vehicles increasing at a higher rate than the road development. To overcome the traffic jam problem, the government introduced bus rapid transit, known as TransJakarta, in 2004. They expects the
INASEA
Iswahyudi Dwi Nurcahyo, Ir. Gunawarman Hartono, M.Eng.
This research executes a working measurement or time study of each operator on three work stations in the finishing line. From the calculation, it is identified that workload of each operator is very low with an average efficiency of 28%. The number of operators can be optimized from nine to