Title

Stepwise Optimization for Model of Integrated Batch Production and Maintenance Scheduling for Single Item Processed on Flow Shop with Two Machines in JIT Environment

Type of Publication
Conference Article
Citation
Zahedi , Rojali and Yusriski R.. Stepwise Optimization for Model of Integrated Batch Production and Maintenance Scheduling for Single Item Processed on Flow Shop with Two Machines in JIT Environment,
ISSN
-
Author(s)
  • Dr. Zahedi, S.Si., M.T.

    Dr. Zahedi, S.Si., M.T.

  • Rojali, S.Si., M.Si.

    Rojali, S.Si., M.Si.

  • Rinto Yusriski